Renovation schedule planner

Schedule demolition, services, drying, finishes and inspection with a contingency buffer.

01

Calculation inputs

Editable example. Replace prices and assumptions with your project data; these are not verified rates or a quote.

Project

You can calculate. The cloud project is unavailable; this form draft can only be recovered on this device.

Open planner
02

Indicative result

54 days
Demolition (days)9/15/2026 – 9/18/2026
4 days
Rough services and building (days)9/19/2026 – 9/28/2026
10 days
Drying and curing (days)9/29/2026 – 10/12/2026
14 days
Finishes (days)10/13/2026 – 10/24/2026
12 days
Final installation (days)10/25/2026 – 10/29/2026
5 days
Inspection and handover (days)10/30/2026 – 10/31/2026
2 days
Schedule buffer (days)11/1/2026 – 11/7/2026
7 days
Save to project

Unsaved changes

Request a professional estimate
Practical guide

How it is calculated

Indicative result = Demolition (days) + Rough services and building (days) + Drying and curing (days) + Finishes (days) + Final installation (days) + Inspection and handover (days) + Schedule buffer (days)

What to check

Calendar days, sequential phases without overlap. Drying depends on products and weather; confirm durations with your contractor. Permits, procurement and holidays are not added automatically.

Reviewed:

Frequently asked questions

Is this a final quote?

No. Results depend on your inputs and the stated scope. A professional must check the property, measurements and conditions before quoting.

Can I use measurements from my plan?

Renovation, radiator, cooling and materials calculators can use internal plan measurements. Enter built area and the thermal envelope separately. You can save scenarios in your project.

Continue your project

Explore all tools
CASA EN CLARO

Let’s talk about your project

Tell us what you want to do. A useful estimate starts with your home, priorities and available budget.

Request a free estimate

Continue your project