Renovating an 80 m² flat: what can your budget actually cover?
Work out what belongs in an 80 m² flat renovation budget, compare three hypothetical spending limits and ask for quotes you can use to make decisions.
Two flats with the same floor area can need very different work. One has sound plumbing and an awkward colour scheme; another has damp, ageing wiring and a bathroom that needs moving. A price attached to 80 m² tells you little until someone has looked beyond the floor plan.
For a home in Spain, start by turning the money available into a defined brief. Decide what needs investigation, what you want to change and what can stay. The useful question is how much of that work your funds can cover, including tax, preparation and work hidden behind the finishes.
Check the flat before setting the scope
Confirm whether 80 m² means usable internal area or built area. Record the kitchen, bathrooms, windows and rooms individually. Photographs help explain the current condition, but they cannot establish what lies behind a wall or whether existing services are suitable to retain.
Ask for an initial assessment of the relevant structure, electrical installation, plumbing, moisture and ventilation before committing the whole budget to finishes. Where something remains uncertain, the quote should identify the assumption and explain how further investigation will be handled. For each provisional allowance, ask what it covers, why it cannot yet be priced and how the final amount will be agreed.
Write down both the changes and the things you will keep
Describe the result room by room. 'New bathroom' could mean replacing fittings in their current positions or removing everything, renewing concealed services and changing the layout. Name the fixtures and finishes, say which services will be retained following assessment, and make responsibility for preparation clear.
Separate essential repairs from improvements you could defer. This is particularly useful when discussing a limited budget: you can ask for an optional door replacement or upgraded worktop without letting those items obscure necessary work. Retaining a layout can avoid some alterations, but retaining defective plumbing simply postpones a problem beneath new finishes.
Official source: CTE · Parte I: proyecto, mediciones y control de obra (junio de 2022)
Three illustrative spending limits
Imagine three owners setting aside different sums for an 80 m² flat. Each chooses a reserve before seeking prices. The amounts remaining below are for the agreed work and products, including applicable tax. These are entirely hypothetical budget caps: none establishes what a Spanish contractor would charge or guarantees that the whole flat can be completed.
The reserves happen to be one tenth of the available funds in this illustration. That is an arithmetic choice, not a recommended contingency percentage. What you set aside should reflect the surveys, unresolved work and your capacity to meet an unexpected bill.
| Total budget | Reserve kept aside | Available, including applicable tax | Work to explore first |
|---|---|---|---|
| €30,000 | €3,000 | €27,000 | Cosmetic work while retaining services found suitable to keep |
| €50,000 | €5,000 | €45,000 | Fuller renewal, with clear decisions about what stays |
| €80,000 | €8,000 | €72,000 | Layout changes or upgraded specifications, subject to feasibility |
Make room for everything around the finished rooms
Include protection of shared areas, strip-out, waste removal, substrate repairs and making good. Then account for the services, kitchen, bathroom, flooring, joinery and decoration actually involved. Check whether professional input, municipal procedures, appliances, moving and temporary accommodation sit inside the contractor's price or in your own budget.
Prevent double counting as well as omissions. Bathroom plumbing may appear in a general services allowance and again in a bathroom package. Ask for the tax treatment in writing: Spain does not apply a reduced renovation VAT rate automatically to every job. Any lower rate depends on the relevant conditions being met, so compare totals with the applicable tax included.
Official source: AEAT · IVA de las obras de renovación o reparación de viviendas
Give every contractor the same brief
A lower total can reflect fewer included items, different quantities or a cheaper specification. Put competing offers beside the same room list and resolve those differences before judging value. Clear answers now also make later changes easier to price.
- Ask for measured quantities and a description of the work behind each allowance.
- Record product ranges or exact models where they affect price and performance.
- Identify exclusions, provisional sums and work supplied by someone else.
- Confirm tax, payment stages and how proposed changes will be priced and approved.
- Check who repairs surfaces after electrical and plumbing work and who removes the waste.
Official source: CTE · Parte I: proyecto, mediciones y control de obra (junio de 2022)
Reduce the brief deliberately if the figures do not fit
When comparable quotes exceed the money available, ask the contractor to price a revised package. Deferring a non-essential room, keeping serviceable windows or choosing a different finish may create a workable plan. Check the consequences: doing a floor now and relocating a partition later can mean paying to disturb finished work twice.
Do not quietly spend the reserve to make the initial agreement look affordable. First establish why the gap exists and which decisions would close it. Approve a version of the brief with a matching price, then keep that version as the reference whenever someone suggests an addition.
Common questions
Can I budget from a price per square metre?
It can provide a rough comparison only when the area definition and included work are genuinely comparable. It cannot replace a condition assessment and measured quotation for your flat.
Is the reserve part of the contractor's price?
No. In this example it is money the owner keeps available. An agreed additional job should have its own written price and approval before that money is committed.
Should every old installation be replaced?
Its condition, suitability and the proposed intervention need professional assessment. Age alone does not establish that a complete replacement is necessary or that retaining it is sensible.
Leave the first meeting with a clearer list
Take the measured plan, your spending limit and a room-by-room brief to the initial discussion. Ask what must be investigated before a reliable price is possible. You should come away knowing which work is essential, which decisions remain open and what each contractor is being asked to price.
Request a preliminary estimate for your flat
Leave your phone number and the property's country and town for a free preliminary renovation estimate. Add any details you wish; this is not a fixed quotation.
The article and enquiry topic are included automatically, so you do not need to repeat them.
Loading the enquiry form…
Request my renovation estimateSources and editorial approach
Editorial guide prepared with AI assistance. Labelled examples are illustrative, not market prices or completed projects. Sources checked on 15 September 2026. Confirm the conditions that apply to your home before commissioning work.